Charger ART
- type
- unit
- unit-type
- ART , work-system
- flightlevel
- 2
- member-of
- Voltfeld
- contributes-to
- Portfolio
- delegator
- Henrik Dahl
- version
- 1.0
- decision_date
- 2026-01-12
- review_date
- 2027-01-11
- created_at
- 2026-10-10
In context
Purpose
Coordinate the three product lines and three FL1 work systems that develop Voltfeld’s chargers so that features land in releases together — hardware, firmware and backend in step — on a ten-week Program Increment cadence. The ART coordinates across the three FL2 product lines — Wallbox, DC Charger, Connectivity — which sit on its level and contribute to it; it plans, syncs, integrates and releases across them, and the product lines coordinate their own teams.
Key Responsibilities
- Run PI planning, the weekly ART sync, the system demo and the inspect-and-adapt workshop, facilitated by the Release Train Engineer.
- Turn portfolio epics into a ranked feature backlog (Product Management) and an architectural runway (System Architect).
- Resolve cross-team dependencies — above all between the two product lines and the two platform teams they draw on, HW Base and Firmware Platform.
- Release: integrate, certify and ship a system release at the end of each PI.
Customers and Deliverables
- Portfolio — delivered epics, a PI predictability measure, an honest capacity signal.
- Manufacturing — a release that can be built: drawings, BOM, test firmware.
- Field Service — release notes, recovery procedures, OTA packages via Connectivity.
Dependencies
Depends on Supply Chain for long-lead parts and tooling, on Manufacturing for ramp capacity and design-for-manufacturing feedback, and on System Integration for certification slots.
External Constraints
- Certification cycles (IEC 61851, EMC, regional approvals) that take longer than a PI.
- Component availability and tooling lead times set by suppliers.
Key Challenges
- Enclosure and tooling lead times exceed one PI; the ART plans in ten-week increments while Supply Chain works on fourteen-week lead times and is not in the room at PI planning.
- Two product lines pull on the same two platform teams with different priorities.
- Hardware integration happens late — the first time a new power stage meets production firmware is on the system rig, not before.
Key Resources
- Three product lines (Wallbox, DC Charger, Connectivity, each with two teams) and three FL1 work systems (HW Base, Firmware Platform, System Integration); the ART roles Release Train Engineer, Product Management, System Architect; the HIL and system test rigs.
Delegator Responsibilities
- Henrik Dahl chartered the ART and keeps it funded per PI through the Portfolio.
Competencies, Qualities and Skills
- Cross-team planning under hardware lead times, systems thinking across power electronics, firmware and cloud, facilitation of thirty-plus engineers at once.
Key Metrics and Monitoring
- PI predictability (committed vs. delivered objectives); feature lead time; release cadence held; cross-team dependencies open at PI planning.
Evaluation Schedule
Inspect-and-adapt at the end of every PI; domain description reviewed yearly, next 2027-01-11.