DWSD.md

Connectivity

type
unit
unit-type
product-line , work-system
flightlevel
2
member-of
Charger ART
contributes-to
Charger ART
delegator
Marit Solberg
version
1.0
decision_date
2026-01-12
review_date
2027-01-11
created_at
2026-10-10

In context

Inferred from the org folder · scroll to zoom, drag to pan, click a box to open it
Inferred from the org folder · click a box for its details, +/− to collapse, scroll to zoom, drag to pan

Purpose

Build and run the cloud side of every Voltfeld charger: the fleet backend, the OCPP connection to charge-point operators, the operator and end-user apps, and over-the-air updates.

An FL2 product line: it coordinates two teams, Charge Point Backend and Driver App, at PI planning and the ART Sync, and contributes to the Charger ART, which coordinates across all three product lines on the same level.

Key Responsibilities

  • Develop and operate the backend and apps; keep the OCPP integration certified.
  • Ship OTA packages for every system release and roll them out to the fleet.
  • Provide the device-side counterpart together with the Firmware Platform, whose protocol stack the backend talks to.

Customers and Deliverables

  • Charger ART — backend features released in step with device releases.
  • Charge-point operators and fleet managers — the connected service.
  • Field Service — remote diagnostics and firmware recovery.

Dependencies

Depends on the Firmware Platform for the device protocol and OTA client, and on Wallbox and DC Charger for product-specific telemetry.

Key Metrics and Monitoring

  • Backend availability; OTA success rate; time from device release to fleet rollout.

Modeling note

The example draws no board for Connectivity.

Like what you see? → Start — build your own org folder in ~2 min

Connectivity.md
---
type: unit
unit-type:
  - product-line
  - work-system
flightlevel: 2
member-of: "[[Charger ART]]"
contributes-to: "[[Charger ART]]"
delegator: "[[Marit Solberg]]"
version: "1.0"
decision_date: 2026-01-12
review_date: 2027-01-11
created_at: 2026-10-10
---
## In context
```dwsd.topology
mode: infer
radius: 2
```
```dwsd.units
mode: infer
focus: self
radius: { up: 1, down: inf }
```
## Purpose
Build and run the cloud side of every Voltfeld charger: the fleet backend, the OCPP
connection to charge-point operators, the operator and end-user apps, and over-the-air
updates.
An FL2 **product line**: it coordinates two teams, [[Charge Point Backend]] and
[[Driver App]], at PI planning and the [[ART Sync]], and contributes to the
[[Charger ART]], which coordinates across all three product lines on the same level.
## Key Responsibilities
- Develop and operate the backend and apps; keep the OCPP integration certified.
- Ship OTA packages for every system release and roll them out to the fleet.
- Provide the device-side counterpart together with the [[Firmware Platform]], whose
protocol stack the backend talks to.
## Customers and Deliverables
- [[Charger ART]] — backend features released in step with device releases.
- Charge-point operators and fleet managers — the connected service.
- [[Field Service]] — remote diagnostics and firmware recovery.
## Dependencies
Depends on the [[Firmware Platform]] for the device protocol and OTA client, and on
[[Wallbox]] and [[DC Charger]] for product-specific telemetry.
## Key Metrics and Monitoring
- Backend availability; OTA success rate; time from device release to fleet rollout.
> [!NOTE]
> **Modeling note.** The example draws no board for Connectivity.