Inferred from the org folder · scroll to zoom, drag to pan, click a box to open itInferred from the org folder · click a box for its details, +/− to collapse, scroll to zoom, drag to pan
Purpose
Develop the DC fast-charger product line — 50 to 150 kW systems for depots and public
sites — including the power cabinet, the dispenser and the product firmware on top of the
shared platforms.
An FL2 product line: it coordinates two teams, DC Power Stage and
DC Site Controller, at PI planning and the ART Sync, and contributes to the
Charger ART, which coordinates across all three product lines on the same level.
Key Responsibilities
Own the DC Charger variants and their certification scope.
Deliver committed features into each PI’s system release.
Integrate the shared power module from HW Base and the firmware base from the
Firmware Platform; coordinate payment and fleet features with Connectivity.
Customers and Deliverables
Charger ART — release-ready DC Charger features and variants.