Inspect and Adapt
- type
- interaction
- interaction-type
- meeting
- for-domain
- Charger ART
- interaction-of
- Charger ART Board , Charger ART
- start
- 2026-09-23T09:00:00
- end
- 2026-09-23T16:00:00
- rrule
- RRULE:FREQ=WEEKLY;INTERVAL=10;BYDAY=WE
- version
- 1.0
- created_at
- 2026-10-10
Why are we doing this meeting?
The PI’s closing day, the day before the next PI planning: the whole increment is shown, the numbers are looked at — above all PI predictability — and the train picks the few problems it will actually work on. Facilitated by the Release Train Engineer; the Business Owners attend the first half.
What is the outcome?
A PI system demo seen by everyone, the predictability measure for the PI, and improvement items with owners that enter the next PI’s backlog as work — not as good intentions.
What decisions are we making, and who makes them?
Which problems the train takes on next PI (the train, by vote); which improvement items become backlog items (the Release Train Engineer with Product Management).
What information do we need?
The whole Charger ART Board, the PI objectives with their business value, the predictability measure, and the root causes gathered through the PI. The last two workshops both landed on the same cause — tooling lead times that outrun the PI — without an item that reached outside the train.
Interactions
| Name | Outcome | Interaction of |
|---|---|---|
| PI system demo | the whole PI’s increment shown | Charger ART Board › Feature › Release › Demoed |
| Quantitative measurement | predictability and flow metrics for the PI | Charger ART Board |
| Problem-solving workshop | root causes and improvement items with owners | Charger ART Board › Feature › Preparation › Program Backlog (before) |
Like what you see? → Start — build your own org folder in ~2 min