The FL1 board of Manufacturing — not the daily line (that runs on the plant’s own
system) but the ramp of each new variant the Charger ART releases: from the release
arriving to stable production. Release Received is the column where the
Feature Route ends for the train and begins for the plant. Two boards, one hand-over,
no loop — the picture the change ladder starts from.
title: Manufacturing
flightlevel: FL1
columns:
- name: Release Received
status-category: to-do
agreements:
- "A release is accepted only with production test firmware from System Integration"
- name: Fixtures and Instructions
status-category: in-progress
- name: Pilot Build
wip: 1status-category: in-progress
check: "First-article inspection passed"
- name: Ramp
status-category: in-progress
- name: Stable Production
status-category: done
Modeling note
Nothing on this board points back at the ART board, and no ART board
column points here.